Click on image to view larger version.



Fig. 3. Schematic alignment of cavities and boreholes: (a) part of the enhanced characterization of the repository block (ECRB) Cross Drift; (b) liquid release test setup in the Cross Drift, including liquid release intervals and liquid injection and seepage collection equipment; and (c) vertical section of Niche 5 along with location of all the test boreholes.