Click on image to view larger version.



Fig. 4. Pressure heads in soil at different depths below the application strip as recorded with tensiometers during the irrigation on Day 97 (25 Mar. 1997), (a) at 1-m lateral distance from the drain and (b) at 5-m lateral distance from the drain.