Click on image to view larger version.


Figure 13


Fig. 13. Rainfall, drain discharge flux, and cumulative drain outflow as observed at the Bokhorst field site for three runoff seasons between 1991 and 1995 (data: Lennartz et al., 1999), and inverse dual-permeability model (DPM) simulation results for the sequential and simultaneous approaches.