Fig. 8. Predicted vs. measured values of silt plus clay for the younger Qf6 surface using ground penetrating radar amplitude (x1) and two binary variables (x2, x3) describing pavement development. Dotted lines are the predictive interval and dashed lines are the confidence interval, both at 95%.