Click on image to view larger version.


Figure 3


Fig. 3. Measured and simulated cumulative drainage for Phase 1 experimental treatments in which all lysimeters where luxuriously irrigated with various irrigation water salinities (ECiw). Irrigation timings are shown on the bottom of each plot and the irrigation depth is indicated on the axes on the right side of each plot.