|
|
||||||||
|
Fig. 8. Results for simulations and the measured drawdowns for the duration of the aquifer test for monitoring cluster F504: (a) well F504-032, (b) well F504-060, and (c) well F504-080. The figure compares between the results of Cases 5 and 8.
|
| HOME | HELP | FEEDBACK | SUBSCRIPTIONS | ARCHIVE | SEARCH | TABLE OF CONTENTS |