|
|
||||||||
|
Fig. 9. Results for simulations and the measured drawdowns for the duration of the aquifer test for monitoring cluster F505: (a) well F505-032, (b) well F505-059, and (c) well F505-080. The figure compares between the results of Cases 5 and 8.
|
| HOME | HELP | FEEDBACK | SUBSCRIPTIONS | ARCHIVE | SEARCH | TABLE OF CONTENTS |