|
|
||||||||
|
Fig. 1. (a) Schematic of the Bokhorst experimental plot, including interpolated groundwater elevations in m above sea level on 25 Mar. 1997. Symbols: piezometer or well location (cross), drain-pipe connected to monitoring station (thick line), drain-pipe ending in trench (hatched line). (b) Time table of the experiment.
|
| HOME | HELP | FEEDBACK | SUBSCRIPTIONS | ARCHIVE | SEARCH | TABLE OF CONTENTS |